• Price/Package: US $8.65 Your Prices
  • Download APP to save EXTRA US $10.
  • Bronze Price:

    US $8.39

    3%off
  • Silver Price:

    US $8.13

    6%off
  • Gold Price:

    US $7.87

    9%off
  • Platinum Price:

    US $7.61

    12%off
  • Diamond Price:

    US $7.35

    15%off
  • 3 Days
    Weight: 1,150(g)
  • Request More Product Information

    I Want Smaller Lots

    I Want Mixed Products

    Request More Product Information

    Dyed Wood Beads, Oval/Oblong, Lead Free, CoconutBrown, 15x7~8mm, Hole: 3mm; about 3800pcs/1000g(WOOD-Q003-15x7mm-01-LF)

    Comments:

    Please input your request.

    I Want Smaller Lots

    Dyed Wood Beads, Oval/Oblong, Lead Free, CoconutBrown, 15x7~8mm, Hole: 3mm; about 3800pcs/1000g(WOOD-Q003-15x7mm-01-LF)

    Original Packing

    • QTY : Package
    • Package Size : g/package
    g

    Invalid Input

    I Want Mixed Products

    Dyed Wood Beads, Oval/Oblong, Lead Free, CoconutBrown, 15x7~8mm, Hole: 3mm; about 3800pcs/1000g(WOOD-Q003-15x7mm-01-LF)

    Comments: Please input your mixed request.

    • Item Code: Please input the item code.

      Comments: Please input your mixed request.

    + Add Mixed Products

  • Please visit PandaWhole, cheapest price waits for you. PandaWhole MOQ: 10 Packages = 1000g * 5 = 5000g
  • Coupon: US $5.00 for NEW Client. Register Now >>

Specification Size Info

Size 15x7~8mm, Hole: 3mm; about 3800pcs/1000g
Material Wood
Color CoconutBrown
Shape Oval
Usage Beads
Package Size 1,000 g per package

Description:

Dyed Wood Beads, Oval/Oblong, Lead Free, CoconutBrown

Size: about 15mm long, 7~8mm wide, Hole: 3mm; about 3800pcs/1000g.

Priced per 1,000 g

Please Note: The color may be slightly different from the picture because of different display device.

Customer Images

No images, please upload your images to help other customers know more about how it looks, behaves and performs.
You can get 1 USD Cash Coupon at most if you share the pictures of your jewelry made by this item. The coupon is determined by PandaHall staffs based on the overall quality of your picture and issued when your picture is screened.

Confirm

Please Note

OK
Country/Region:

Search by Image

·Search pandahall with an image instead of text.

  • 1. The image must be in one of the following formats: .jpg, .png
    2. The size of the image should be less than 2M!
    3. The image length and width must be greater than or equal 200 pixels and smaller than or equal to 1024pixes.
  • 1. The image must be in one of the following formats: .jpg, .png
    2. The size of the image should be less than 2M!
    3. The image length and width must be greater than or equal 200 pixels and smaller than or equal to 1024pixes.

Uploading File